1. Twenty percent of the main parking lot would be paved
with the remainder being gravel.
2. Roads leading to each cluster might be gravel. Later these gravel roads might be paved.
3. Paving might be accomplished by using pulverized concrete or oyster
shells. Poured concrete or bricks may also be a way of paving.
4. Concrete sidewalks would run parallel to each gravel road. Every few hundred feet pavers would be installed in the sidewalk
so that underground utilities might later be easily run under the sidewalk.
5. The inner circle road in each cluster would be paved so that children
could play on it.
6. Jogging & walking paths might be tamped earth covered with
roll-roofing.